Legacy platforms replacement

Sipos Attila

PKI Fejlesztési Igazgatóság Balatonkenese 2009.05.26.

(2)

Contents

Old legacy systems in MT’s network

Financial statistics

Technical risks

Target architecture and migration rules

Estimated capex and proposed time schedule

Conclusions

(3)

Old legacy systems in MT’s network

* average time from purchase weighted by equipment number

Platform Network size Average equipment age (year) *

Hytas-Ke

125k POTS; 12k ISDNcapacity 12

voice optical access

PSTN 3.4 M 64kbit/schannel capacity 18

voice switches

MLLN 13 000 user equipmentat1000 CO sites 12

narrowband data ATM DSLAM

213k portcapacity 451sites 6

broadband access

PDH 1555 equipmentat 1128 CO sites 15

old transmission

Access Mux-es 36.7k POTS; 2.6k ISDNcapacity at 725sites voice access 11

(4)

Book values of legacy systems

* Not including ADS exchanges 0

2 000 4 000 6 000 8 000 10 000 12 000

2008 2009 2010 2011 2012 2013 2014 2015

mHUF

HYTAS PSTN * MLLN ATM

ATM DSLAM PDH

Accesss Mux

(5)

• Legacy systems support to generate 163 BHUF revenue

• The most significant cost components:

• General costs: 37%,

• Outpayments: 13%,

Costs and revenues of legacy systems - 2008.

0 20000 40000 60000 80000 100000 120000 140000 160000 180000

Revenue Costs

M HUF

Revenue General costs

Other not technical tasks Outpayments

Non EBITDA realated costs (D&A, capital cost) Other not Technology

Technical Services Directorate Real estate

Connected infrastructure (eg. cable network, management systems)

Direct technical costs

• other not technical tasks (mostly marketing activities): 16%,

• D&A, capital cost: 24%.

• Direct technical cost is only 2% (2,9 BHUF)

Costs and revenues of legacy systems in 2008

(6)

Costs of products on legacy systems - 2008.

0 20 000 40 000 60 000 80 000 100 000 120 000

Flexcom

DatexP Fram

e relay

MLLN Access IP services HSI

VoIP

Voice services (PSTN/ISDN)

Multiflex

HSLL

Products M HUF

General costs

Other not technical tasks

Non EBITDA realated costs (D&A, capital cost) Other not Technology

Technical Services Directorate Real estate

Technology

Costs of products in 2008

(7)

Direct technical costs in 2008

67

778

54 58 0 0

99

317 181

157 59

1 125

0 200 400 600 800 1 000 1 200 1 400 1 600 1 800 2 000

Hytas- KE

PSTN MLLN ATM DSLAM

PDH Access Mux

mHUF Operational cost

(mHUF)

System support (mHUF)

(8)

Technical risks

General risks

the equipment are very old, they are at their end of life (EOL) or over EOL

high probability of equipment failures, difficult to keep the SLAs

very expensive system support or no system support at all from the vendor

lack of spare parts

repairing faulty cards is difficult or not possible

PDH specific risk

High risk of equipment faults, especially end of life of Lasers

Access Mux specific risk

difficult and expensive operation due to degradation and increasing saturation of copper cables

(9)

Target network architecture

opt. Packet Cu

Cabinet Local Exchange PoP

DSLAMor MSAN

IP/MPLS Backbone

Leased Link 2 … 155 Mbit/s

Leased Link 2,5G/10G

LSR BRAS

Cluster

Customer Location Product

Service Platform TMH, 3rt PTY

OTN/DWDM backbone OTN/DWDM

Metro/Regional

ENT

LER LER

Residential/Business DSL

Ethernet Link 10M/100M

Ethernet Link10G Ethernet Link 1G

Ethernet based L2 Aggregation

Seamless MPLS IP-TV

D-Server

ENT ENT NT

TDMoE

NT

ASR PSR

EoSHDSL ONT

OLT

Residential/Business GPON

Outdoor DSLAM or

MSAN

NT

(10)

ATM DSLAM

MLLN Node PDH

(S)HDSL PDH Micro

Access Multiplexers

365 settlements

Optical

Copper

Microwave

Optical Copper

New optical cable / Ethernet Microwave system

1103 nodes 1-1.6 M cust.

725 sites 34.3k POTS

2.20k ISDN

MSAN NB ? / MSAN BB Annex J

240 sites

WDM Ethernet Switch

1000 CO nodes 13k end user

equip.

1175 nodes 173k cust.

Migration rules

Ethernet DSLAM Ethernet over Copper Ethernet switch

RSU/SSU

(11)

Technical solutions and capex estimation

We presumed that PSTN, MLLN, ATM, PDH and Access Mux replacements will go in parallel, which results appr. 2-3 BHUF save on the optical cable and microwave

installations.

Platform Short description of replacement Estimated capex in

paralel realisation (mHUF)

Hytas-Ke Migration to GPON Migration by MSAN

in T-Kábel areas: HFC (DOCSIS 3.0)

PSTN replacing PSTN Switches with MGWs and IMS replacing RSUs with MSANs

reconstruction of Distribution Frames 3500

installing optical cables and microwave links to replace copper cables 620 MLLN technology migration to TDMoIP, Eth access for IP VPN and XoT (end-to-end) 2000 installing optical cables and microwave links to replace copper cables 1 398

ATM DSLAM migrating DSLAM ports to GPON, IP DSLAMs 1200

bandwidth limited locations: optical cables and microwave links 624

PDH installing WDM/L2 switches 2200

Access Multiplexers Installing new MSANs 1450

installing optical cables and microwave links to replace copper cables 4 660

XoT: X.25 over TCP IP 38 052

7000 13400

(12)

Proposed time schedule

2009 2010 2011 2012

PSTN - EWSD, AXE replacement ATM DSAM replacement

MLLN migration

Access Multiplexers replacement

2013 2014 2015

PDH replacement

HYTAS replacement IMS core consolidation

PDH replacement in ADS areas

CAPEX: 4118mHUF 5715mHUF 9889mHUF 9852mHUF 6160mHUF 2318mHUF

(13)

Conlusions

The full old legacy network replacement CAPEX is apr. 38 MrdFt in the next 6 years

Hytas replacement shall be achieved independently from other replacements

The replacement of PSTN, ATM DSLAMs, Access Muxs and MLLN nodes shall be realised together and they shall be harmonised with the PDH transport migration.

The most significant cost element is the construction of the new transport media optical cable/microwave links on the rural areas

Hivatkozások

KAPCSOLÓDÓ DOKUMENTUMOK

LXI is an instrumentation platform based on industry standard Ethernet technology (IEEE 802.3), TCP/IP protocols, LAN cables, web browsers … designed to provide!.

This optical IP Ethernet architecture promises to become the dominant means of delivering bundled voice, data, and video services over a single network. In addition, this

transmission portfolio (SONET/SDH–based multiservice platforms and the optical portfolio) can choose to have their transmitter generate the correct wavelength directly and

Nowadays different vendor companies have developed an extensive range of solutions to improve the passenger’s journey, streamline and integrate airline and airport operations,

At a difference to the usual structural form of suspension highway bridges. industrial steel structures are often designf'd with cables arranged in

In this paper, we propose a technique to find the bandwidth sharing scheme of end-to-end congestion control protocols1. This technique divides the analysis work into two

In this study, design optimization of four double-layer grid roof structures, with different spans with and without cables, were investigated?. The examples included

The comhined effect of electric and magnetic fields causes disturhances only in the case of high-frequency signals, thus its examination could he omit- ted. Since, however,