• Nem Talált Eredményt

18 eredmény a kulcsszóra: 'core competencies required of project managers'

230 Monika Barton 3.4 DEVELOPING CORE COMPETENCIES OF SME MANAGERS USING HEUTAGOGY PRINCIPLES

Entrepreneurship is defined as “the process of doing something new (creative) and something different (innovative) for the purpose of creating wealth for the individual and

Protected

N/A

15
0
0
2022
Interbank​ ​networks​ ​and​ ​the​ ​multilayer​ ​structure​ ​of economic-financial​ ​transactions

In the first layer, banks and other financial institutions interact with each other through loans, debt and ownership in a sophisticated manner producing a complex network

Protected

N/A

3
0
0
2022
július 28 - augusztus 22.) 4 hetes 25 000 4 igen 2 2008/66 Bratu Nikolett 23 MFK Nyelvtanfolyamon való részvétel költsége (német - 2008

Külföldi együttműködés keretében végzett régészeti kutatás útiköltsége (Izrael, Haifa

Protected

N/A

4
0
0
2022
LPVcore: MATLAB Toolbox for LPV Modelling, Identification and Control

In recent years, the linear parameter-varying (LPV) mod- elling paradigm has received considerable attention from the identification and control community (e.g., see T´oth, 2010;

Protected

N/A

6
0
0
2022
External Rapid Prototyping Validation System for the Automotive Development Cycle

In order to have the hardware implementation, it is necessary to adapt a serial engine control unit, having the role to communicate with the external rapid

Protected

N/A

17
0
0
2022
Ethernet Transport over RPR

• RPR nodes can transparently pass MPLS packets for nodes that don’t have a need to be MPLS enabled or to reduce MPLS processing in MPLS enabled nodes (in the event MPLS

Protected

N/A

15
0
0
2022
Non-linear State-space Model Identification from Video Data using Deep Encoders

The aim of this paper is to develop an encoder-informed non-linear state-space identification approach that can ef- ficiently process high-dimensional input-output data. To this

Protected

N/A

5
0
0
2022
A SOLUTION TO TREAT MIXED-TYPE HUMAN DATASETS FROM SOCIO-ECOLOGICAL SYSTEMS

project characteristics, management decisions, and project-specific decisions based on survey responses by managers of invasive Tamarix removal projects..

Protected

N/A

10
0
0
2022
VARIABLE REMUNERATION FOR PROJECT MANAGERS

 The degree of complexity of a project has a significant influence on the effort of the project management activity as such, but also on the efforts of the project manager to

Protected

N/A

26
0
0
2022
Local strategies for tackling uncertainties, decline and peripherality through transnational networking in East Central Europe

The results – that rest basically on series of (over 200) interviews and document reviews in seven study-areas – suggest that i) new institutional and individual strategies and

Protected

N/A

2
0
0
2022
JJ II

Key words: Normal structure coefficient, Neumann-Jordan constant, Non-square constants, Banach

Protected

N/A

11
0
0
2022
The most common lacks in employees are 1) an understanding of the stark differences in levels of negotiation compe- tence and 2) how to negotiate in English

Training programs on negotiation uses a wide range of professional experiences in pre- paring lawyers, managers, bankers and diplomats to employ key tools and competencies in

Protected

N/A

7
0
0
2022
KOVÁCSNÉ ANTAL ANITA

The aim of the EIF is to encourage micro, small and medium-sized enterprises to use repayable rather then non-repayable sources of financing from the Structural Funds of

Protected

N/A

15
0
0
2022
Further some inequalities are given for the moments of bivariate distributions

But before maximizing the entropy function one has to see whether the given moment values are consistent or not i.e whether there is any probability distribution which corresponds

Protected

N/A

9
0
0
2022
"Les petites Cavé"

A miniszteri rendelet általános polgárjogot igórt ugyan az uj intéz- ménynek, néhány ezer forintot ki is sorsoltak a legbuzgóbb tanítók közt, Deák Ferenc maga is

Protected

N/A

4
0
0
2022
CONSER: Nemzetközi on-line periodikum-adatbázis kiépítése megtekintése

Az az elképzelés, hogy minden tétel csak egyszer kerüljön katalogizálásra, néhány éve még álomnak tűnt, ma elérhető közelségbe került, még periodikumok ese­.

Protected

N/A

2
0
0
2022
Hygienic bacteriological valuation of the Upper Tisa Region

Between 19-23 June 1995 a hygienic bacteriological survey focusing on the pollution effect of River Szamos was carried out by the Upper Tisa Environmental Agency, on the

Protected

N/A

5
0
0
2022

Töltsön fel további dokumentumokat, és töltse le azonnal az anyagtanulmányokat!